A Touchwood designed and supplied air tight frame in Sussex which was put up
by the client himself has just had an air tightness test, and achieved a result
of 0.3 ac/h @50Pa. This is a result few in the industry achieve, for a self
builder to do this shows the dedication his team has put into the build, along
with the effectiveness of our air tight detailing built into our frames.
We can design and supply air tight frames for any client who wishes to put
the house up themselves, or our team can erect the frame for you if preferred.
See below for images of this exciting self build project.
No comments:
Post a Comment